1655207245670263.png

Hotline:

0755-23286182

汽车pcb线路板

News

Product

Contact

Shenzhen Tengxingsheng Electronics Co., Ltd.

Contact: Miss Wen

Tel: 0755-23286182

Mob: 13570819121

QQ: 1456258664

QQ: 2316907424

Fax: 0755-23286183

Email: txspcbsc@163.com txspcb@163.com

Web : en.txspcb.cn

Add: 3rd Floor, Building 3, Jinkang Industrial Park, No. 1 Shajing Road, Baoan District, Shenzhen

Explain how the circuit board factory will make the circuit board for you?

Current location : Home >> News >> Industry News

Explain how the circuit board factory will make the circuit board for you?

Date of release:2019-02-20 Author:admin Click:

The circuit board factory will show you how to make circuit boards  


Design the schematic diagram according to the circuit function needs. The design of the schematic diagram is mainly based on the reasonable construction of the electrical performance of each component according to the needs. Through this diagram, the important functions of the PCB circuit board and the relationship between the various components can be accurately reflected. The design of the schematic diagram is the first step in the PCB manufacturing process, and it is also a very important step. Usually the software used to design the circuit schematic diagram is PROTEl.

 

After the schematic design is completed, it is necessary to further encapsulate each component through PROTEL to generate and implement a grid with the same appearance and size of the components. After the component package is modified, execute Edit/Set Preference/pin 1 to set the package reference point on the first pin. Then execute Report/Component Rule check to set the complete rules to be checked, and OK. At this point, the package is established.

 

Formally generate the PCB. After the network is generated, the position of each component needs to be placed according to the size of the PCB panel. When placing, it is necessary to ensure that the leads of each component do not cross. After the placement of components is completed, DRC inspection is carried out after Z to eliminate the pin or lead crossing errors of each component during wiring. When all errors are eliminated, a complete pcb design process is completed.

 

Use special carbon paper to print out the designed PCB diagram through an inkjet printer, then press the side printed with the circuit diagram against the copper plate, and then put it on the heat exchanger for thermal printing. The circuit diagram ink is glued to the copper plate.

 

plate. Prepare the solution, mix sulfuric acid and hydrogen peroxide in a ratio of 3:1, then put the copper plate containing the ink in it, wait for about three to four minutes, and wait for the copper plate except for the ink to be completely corroded, then remove the copper plate , then rinse off the solution with clean water.

 

Punch holes. Use a punching machine to drill holes on the copper plate where the holes need to be left. After completion, each matching component is introduced from the back of the copper plate and two or more pins are introduced, and then the components are welded to the copper plate with a welding tool.

 

After the welding work is completed, a comprehensive test is performed on the entire circuit board. If there is a problem during the test, it is necessary to determine the location of the problem through the schematic diagram designed in the first step, and then re-solder or replace the components. When the test is successfully passed, the entire circuit board is completed.

 

circuit board factory


The address of this article:http://www.txspcb.cn/en/news/380.html

Key word:circuitboardfactory,IndustrialcontrolPCBcircuitboard,PCBcircuitboard

Recently browse:

About
Company Profile
Honor
Product
High Precision Multilayer HDI Blind Via Plate
Double-sided Circuit Board
Flexible FPC Soft Board
Rigid-flex Multi-layer Board
High Frequency Signal Board
News
Company News
Industry News
Common Problem
About

Mob: 13570819121

Email: txspcbsc@163.com

Web : www.txspcb.cn

Add: Jinkang, No. 1 Shajing Road, Baoan District, Shenzhen

3rd Floor, Building 3, Industrial Park

1655207300120235.png

SWEEP

  • Service
  • number
    13570819121
  • Message
  • web site
  • Online Service